Alarm.com · Build a Trailer

Configure your PSU.

AC-powered with lithium backup. Pole or wall mount, self-installed — for rooftops, courtyards, and anywhere a trailer can't fit or the sun can't reach.

Full product page and specs

Own the unit. Quoted against this build, with volume and agency pricing available. Sharpvue OS is included — it runs the system.

01

Platform

Sharpvue OS runs the unit. This is what runs on top.

Alarm.com for Business

The same box, fully Alarm.com integrated — video and intrusion in one app.

Video, intrusion, and the trailer's smart locks live in the Alarm.com for Business app. Standard RTSP streams and ONVIF, so any third-party VMS can take the feed too.

02

Power

Rated All zones. What the unit carries.

AC input110–277 V universal mains
Battery backupLithium — rides through outages
Camera powerPoE outputs for the integrated cameras
DeterrenceStrobe, siren, and two-way speaker — standard
03

Operating system

Sharpvue OS runs the unit. It comes with every build on this program.

Sharpvue OS is included with every PSU on the Alarm.com program and quoted with the build — there is no trial period and no hardware-only option.

04

Cameras

Up to 3 per unit. Any mix of up to three cameras.

ADC-VC7398PA · Max 12.4W (IR on) / 9.6W (IR off) · · Specs

2
2 of 3 cameras
05

Deterrence & add-ons

The BLAST ships on every unit and stays on the build. Everything else is quoted with the build.

Included: Sharpvue BLAST — IP Strobe SpeakerStandard on every unit120 dB siren, front and rear strobes, and two-way talk-down. Fitted, wired, powered, and provisioned at the factory on every unit — included at no extra cost.No extra cost
06

Site plan

Find the site, drop your units on it, and aim the cameras. The address becomes the delivery address, and the plan goes on the build sheet and to the specialist who quotes it.

07

Your build

Everything above, in one sheet. This is what we email you.

Power budget

Recalculated as you change the build

Average load

50 W

1.20 kWh per day

Supply

AC

Grid-powered, every zone

Requesting a build is not an order. A Sharpvue specialist confirms the configuration, quotes it, and walks you through delivery. Lead time is typically 2–4 weeks.

PSU

50 W load